STAMPIN' UP! OFFICE AND DISTRIBUTION CENTER
|
|
Sitting on a 300,000 square foot campus on 55 acres in Riverton, Utah; the new Stampin Up! campus has an administrative home office spanning 100,000 square feet and includes Class-A office space with ...
more...
|
|
|
|
|
|
|
|
|
|
|
MICRON - LEHI TECHNOLOGY ASSEMBLY FACILITY
|
|
Micron selected multiple Utah-based contractors to build a 2.3 million square-foot, $2.5 billion semiconductor wafer fabrication plant. Oklands portion of the project consisted of the Technology Assem...
more...
|
|
|
|
|
ELLIOT CORPORATE CENTER
|
|
This 211,000 square foot, two-story Class B Office building was a fast-track scheduled project, aided by it being constructed of concrete tilt-up and glass panels. This facility consists of a main lob...
more...
|
|
|
|
|
ENGLAND TRUCKING HEADQUARTERS & SLC TERMINAL
|
|
Okland Construction provided CR England the design/build, phase and construction phase services for the construction of this large campus as well as the subsequent two major expansions. Okland coordin...
more...
|
|
|
|
|
ENGLAND TRUCKING MIRA LOMA TERMINAL
|
|
This design/build refrigerated transportation trucking terminal serves the West Coast. The buildings include 26,000 s.f. mechanics shop, a building with a mezzanine/office level, 5,000 s.f. truck wash...
more...
|
|
|
|
|
GENEVA STEEL QBOP FACILITY
|
|
As part of their massive upgrade in their steel-making technologies, Geneva Steel contracted with Okland (due to our experienced concrete work) to build the concrete foundations and structures for the...
more...
|
|
|
|
|
|
|
|
|
|
|
JW BREWER TIRE & DISTRIBUTION CENTER
|
|
Okland managed the design/build a multi-story, 67,584 square foot tire distribution center that features retail space and offices. The facility includes approximately 6,000 square feet of office and r...
more...
|
|
|
|
|
KENNECOTT UTAH COPPER SMELTER MODERNIZATION
|
|
Okland performed extensive construction management and general contracting services for Kennecott’s massive Smelter Modernization. The largest of these projects were a sequence of concrete projects fo...
more...
|
|
|
|
|
TAD CONSOLIDATED MAINTENANCE FACILITY
|
|
This project is a large, truck maintenance facility covering over 450,000 square feet. The facility features refurbishing equipment, assembly line equipment for engine and power-train rebuilding as we...
more...
|
|
|
|
|
|
|
|
WAL-MART DISTRIBUTION CENTER
|
|
Okland Construction completed 600,000 s.f. of this fully-automated warehouse and over 1 million s.f. of concrete paving – all within the tight schedule of six months. The $13 million project also cont...
more...
|
|
|