Spotlight - Providing Solutions: Subcontractor Surprises
Spotlight - Providing Solutions: Subcontractor Surprises
- Providing Solutions: Subcontractor Surprises -
Okland Construction can mitigate potential surprises by providing innovative, problem-solving strategies as well as cost and scheduling recommendations to keep jobs within budget and schedule (more)

Back to Projects
National Renewable Energy Laboratory Solar Aray
NATIONAL RENEWABLE ENERGY LABORATORY SOLAR ARAY
Okland Construction provided the installation of a single-axis tracker system and 5,670 modules for the National Renewable Energy Laboratory. The project, located in Golden, Colorado, consists of a 1... more...

Bomatic Plastics Extrusion Manufacturing/Distribution Facility
BOMATIC PLASTICS EXTRUSION MANUFACTURING/DISTRIBUTION FACILITY
Oklands challenge on this project was to design/build, on a turnkey basis, Bomatics new Plastic Bottle Manufacturing facility under the auspices of a tight budget and schedule. This new architectural ... more...

Stampin' UP! Office and Distribution Center
STAMPIN' UP! OFFICE AND DISTRIBUTION CENTER
Sitting on a 300,000 square foot campus on 55 acres in Riverton, Utah; the new Stampin Up! campus has an administrative home office spanning 100,000 square feet and includes Class-A office space with ... more...

Micron - Lehi Technology Assembly Facility Tenant Improvements
MICRON - LEHI TECHNOLOGY ASSEMBLY FACILITY TENANT IMPROVEMENTS
Okland performed various construction services on the 200,000 square foot technology (chip) assembly building that Okland completed two years earlier. In preparation to start producing memory chips (w... more...

Micron – Lehi Manufacturing Plant Improvements
MICRON – LEHI MANUFACTURING PLANT IMPROVEMENTS
Okland was the only contractor Micron invited back to perform nine miscellaneous construction/improvement projects throughout the 2.3 million square foot, $2.5 billion semiconductor wafer fabrication ... more...

Micron - Lehi Technology Assembly Facility
MICRON - LEHI TECHNOLOGY ASSEMBLY FACILITY
Micron selected multiple Utah-based contractors to build a 2.3 million square-foot, $2.5 billion semiconductor wafer fabrication plant. Oklands portion of the project consisted of the Technology Assem... more...

Elliot Corporate Center
ELLIOT CORPORATE CENTER
This 211,000 square foot, two-story Class B Office building was a fast-track scheduled project, aided by it being constructed of concrete tilt-up and glass panels. This facility consists of a main lob... more...

England Trucking Headquarters & SLC Terminal
ENGLAND TRUCKING HEADQUARTERS & SLC TERMINAL
Okland Construction provided CR England the design/build, phase and construction phase services for the construction of this large campus as well as the subsequent two major expansions. Okland coordin... more...

England Trucking Mira Loma Terminal
ENGLAND TRUCKING MIRA LOMA TERMINAL
This design/build refrigerated transportation trucking terminal serves the West Coast. The buildings include 26,000 s.f. mechanics shop, a building with a mezzanine/office level, 5,000 s.f. truck wash... more...

Geneva Steel QBOP Facility
GENEVA STEEL QBOP FACILITY
As part of their massive upgrade in their steel-making technologies, Geneva Steel contracted with Okland (due to our experienced concrete work) to build the concrete foundations and structures for the... more...

Hill Air Force Base Hydraulic/Pneudralic Technical Repair Facility
HILL AIR FORCE BASE HYDRAULIC/PNEUDRALIC TECHNICAL REPAIR FACILITY
This project is a 51,371 s.f., three-story facility that will facilitate testing, repair, overhaul and maintenance of critical components for all active Air Force aircraft, as well as Minuteman and ot... more...

Hill Air Force Base Munitions Maintenance and Storage Facilities
HILL AIR FORCE BASE MUNITIONS MAINTENANCE AND STORAGE FACILITIES
This design/build project is a new one-story, 4,000 square foot facility to maintain munitions delivery systems. The facility includes a bridge crane, a paint booth, equipment storage and processing r... more...

JW Brewer Tire & Distribution Center
JW BREWER TIRE & DISTRIBUTION CENTER
Okland managed the design/build a multi-story, 67,584 square foot tire distribution center that features retail space and offices. The facility includes approximately 6,000 square feet of office and r... more...

Kennecott Utah Copper Smelter Modernization
KENNECOTT UTAH COPPER SMELTER MODERNIZATION
Okland performed extensive construction management and general contracting services for Kennecott’s massive Smelter Modernization. The largest of these projects were a sequence of concrete projects fo... more...

TAD Consolidated Maintenance Facility
TAD CONSOLIDATED MAINTENANCE FACILITY
This project is a large, truck maintenance facility covering over 450,000 square feet. The facility features refurbishing equipment, assembly line equipment for engine and power-train rebuilding as we... more...

Utah Power Geothermal Steam Plant Turbine Pedestal and Concrete Structures
UTAH POWER GEOTHERMAL STEAM PLANT TURBINE PEDESTAL AND CONCRETE STRUCTURES
Utah Power contacted Okland to build the turbine pedestal and other concrete structures for their geothermal plant in Southern Utah. The pedestal had to be large enough to encompass and secure the pla... more...

Wal-Mart Distribution Center
WAL-MART DISTRIBUTION CENTER
Okland Construction completed 600,000 s.f. of this fully-automated warehouse and over 1 million s.f. of concrete paving – all within the tight schedule of six months. The $13 million project also cont... more...