|
|
|
|
|
CITY CREEK PROJECT
|
|
Okland Construction has been awarded demolition, excavation, and shoring of Block 76 in downtown Salt Lake. A 4-story underground parking structure will be built to grade level. Above that will be a m...
more...
|
|
|
|
|
|
|
|
|
|
|
FIRST SOLAR TENANT IMPROVEMENT
|
|
This tenant improvement was constructed to meet LEED Certified requirements. The wall panel system included full glazed walls, partial glazed walls, and non-glazed walls. The ceiling for the facilit...
more...
|
|
|
|
|
HOLLAND & HART TENANT IMPROVEMENT
|
|
The Holland and Hart offices are located on the top two floors of the new 222 High Rise (add anything you want about the base building.) The design by Burkett Design of Denver Colorado, incorporates ...
more...
|
|
|
|
|
MYRIAD GENETICS PHASE V TENANT IMPROVEMENT
|
|
This project consists of interior finishes for a 65,000 SF, three story laboratory space with intermixed office areas on three floors. It is a expanded facility for the Myriad Pharmaceuticals branch o...
more...
|
|
|
|
|
SK HART BUILDING RENOVATION
|
|
A three story 16,000 square foot tenant improvement project of an existing building built in 1983 in Salt Lake Citys downtown historic district. Exterior renovations included replacing landscape retai...
more...
|
|
|
|
|
|
|
|
|
|
|
|
|
|
VANCOTT LAW FIRM TENANT IMPROVEMENT
|
|
Levels 18 - 20 in the Beneficial Life building are home to the new Van Cott Bagley law offices. Includes a 3-story, interior, grand staircase that has flared, sweeping stringers. The ornamental metal ...
more...
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SALT LAKE TRIBUNE
|
|
Okland performed the tenant build-out of this 24,000 square foot space within the top floor of Gateways seven story office tower to function as the Salt Lake Tribunes new editorial offices. Our team w...
more...
|
|
|
|
|
ARCHITECTURAL NEXUS TENANT BUILD-OUT
|
|
This 23,000 square foot office space was designed and constructed to transcend the tenets of traditional architectural offices by featuring four neighborhoods that fill a quadrant of the space. Each o...
more...
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WASATCH ADVISORS
|
|
This project consisted of improvements made to 2,918 square feet of mostly client reception/meeting areas in a high-end office building in the middle of downtown Salt Lake City. The project was comple...
more...
|
|
|
|
|
ZIONS SECURITIES CORPORATION
|
|
Okland completed interior work on this downtown Salt Lake City office tower that due to the quality finishes and new employee space configuration upgraded the project to high-end, Class A office space...
more...
|
|
|
|
|
CITICOURT OFFICE TENANT IMPROVEMENT
|
|
In order to meet the strict 22-day schedule, Okland Solution crews began work on this 1,863 s.f. tenant improvement project before the owner moved out from the space. Crews carefully performed their w...
more...
|
|
|
|
|
|
|
|
MYRIAD GENETICS, PHASE III EXPANSION
|
|
This is a three-story, 58,000 square foot moment-frame steel building with glass curtain wall and a panelized masonry veneer with a three-story, 106,000 square foot, post-tensioned and structural conc...
more...
|
|
|
|
|
THE GATEWAY MIXED-USE DEVELOPMENT
|
|
Okland simultaneously performed design/assist services, managed and worked with the 12 different contractors, and constructed our own four sections of this 650,000 s.f. project while maintaining an in...
more...
|
|
|
|
|
|
|
|
|
|
|
PROLEXYS PHARMACEUTICALS BUILDING BUILD-OUT
|
|
The buildout of Prolexys new 34,000 square feet of medical laboratories, data rooms, dark and clean rooms, culture/incubation/germ areas, support space, and administrative/staff offices was technicall...
more...
|
|
|
|
|
UNIVERSITY OF UTAH KINGSBURY HALL
|
|
The renovation/restoration and seismic retrofit of this four-story stage house. Offering over 800 seats, this high-end, 66,000 s.f. historic building includes hand-painted murals, dressing rooms, gree...
more...
|
|
|
|
|
LDS BEEHIVE HOUSE
|
|
The Beehive House, where Brigham Young and his family lived after being built in 1854, is a National Historic Landmark. Like its sister-structure, the Lion House, the LDS Church contracted with Okland...
more...
|
|
|
|
|
|
|
|
LDS LION HOUSE
|
|
The Lion House, one of Salt Lake City's famous land marks was originally built in 1856 by Brigham Young, the great Mormon colonizer, territorial governor and founder of Salt Lake City. The house gets ...
more...
|
|
|
|
|
LDS MANTI UTAH TEMPLE IMPROVEMENTS
|
|
Okland Construction has performed various interior and exterior improvements and restorations to the historic Manti Utah Temple. Located on 27 acres on a hill originally the Manti Stone Quarry later b...
more...
|
|
|
|
|
LDS SALT LAKE TEMPLE IMPROVEMENTS
|
|
Okland Construction has had the great opportunity to perform various interior and exterior improvements and restorations to the famous historic Salt Lake Utah Temple. Located on 10 acres within what i...
more...
|
|
|
|
|
FIESTA MALL TENANT IMPROVEMENTS
|
|
Okland provided tenant improvement services for a regional mall to install special lighting, architecture, artwork and water features within 100,000 square feet of the structure. Okland Construction w...
more...
|
|
|
|
|
MOUNTAINWEST SURGICAL CENTER BUILD-OUT
|
|
This 18,000 square foot medical facility, built within the 120,000 square foot MountainWest Medical Office Building (built by Okland) features five state-of-the-art operating rooms, with associated pr...
more...
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TARGET SUPERSTORES TENANT IMPROVEMENTS
|
|
The remodel / tenant improvement of this 125,000 s.f. retail center was completed in phases during hours that the facility was not in operation and encompassed of every area of the building. Improveme...
more...
|
|
|
|
|
THE GATEWAY - UP DEPOT
|
|
Okland restored, renovated and seismically upgraded the historic Union Pacific Depot (originally built in 1908) to house 55,540 square feet of retail space at a cost of $6 million. The building featur...
more...
|
|
|
|
|
WORKING RX
|
|
Okland completed a multi-floor, 50,000 square foot build-out of Class A office space in a building located in the upscale Lake Park Business Campus. The scope of work included new private offices, ope...
more...
|
|
|
|
|
ZCMI CENTER MALL ADDITION & REMODEL
|
|
Okland performed design/build services for Zion’s Securities for the new addition and remodel of the ZCMI Mall with its historic façade. Originally founded in 1868, Zion's Co-operative Mercantile Inst...
more...
|
|
|